Categories
 
Contributors
 
 Orientation
 
Created Date
From:  
To:  
 
Sort By


Keywords List  

Wembley stadiumLondon Cleaning up welds on the interlacing steel tubes of the signature arch constru
Asset Information : A012-01660

Wembley stadium-London: Cleaning up welds on the interlacing steel tubes of the signature arch, constructed on the ground by Cleveland Bridge (before litigation withmain contractor Multiplex). After lifting the 317 metres long steel arch became the longest single span roof structure in the world.

  Back to my search

Reference: A012-01660 (Rights-Managed)
Contributor: © Adrian Greeman
Restrictions: Please contact Construction Photography for information about restrictions.
Model Release: No
Property Release: No
Call us on: +44 (0)20 7421 6000
  
Image size:
dimension print size dpi
3418px X 5114px A3 - 42.0cm X 29.7cm 300 dpi
Prints and Canvas
Do you want to hang this image on your wall?
Pricing 
Rights Managed images can be priced by clicking the "Price Image" button below.
To price images you need to be logged in - if you do not have an account, please or
Search by Keywords