Categories
 
Contributors
 
 Orientation
 
Created Date
From:  
To:  
 
Sort By


Keywords List  

Concrete caisson and Potain tower crane during foundation construction for the RionAntirion cable st
Asset Information : A012-00136

Concrete caisson and Potain tower crane during foundation construction for the Rion-Antirion cable stayed road bridge. Greece. Foundations of the Rion-Antirion bridge, Gulf of Corinth, Greece. The bridge is situated in an area of high seismic activity, with the two ends of the bridge founded on different tectonic plates, resulting in a relative movement of almost 2cm per year. The principal supports stand in up to 65m of water, and the main pier foundations (cast in a dry dock on-site before being floated to an adjacent area of deep water for completion) measure 90m in diameter.

  Back to my search

Reference: A012-00136 (Rights-Managed)
Contributor: © Adrian Greeman
Restrictions: Please contact Construction Photography for information about restrictions.
Model Release: No
Property Release: No
Call us on: +44 (0)20 7421 6000
  
Image size:
dimension print size dpi
2417px X 3625px A4 - 29.7cm X 21.0cm 300 dpi
Prints and Canvas
Do you want to hang this image on your wall?
Pricing 
Rights Managed images can be priced by clicking the "Price Image" button below.
To price images you need to be logged in - if you do not have an account, please or
Search by Keywords